Schreienesch School-Complex Friedrichshafen

Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
Schreienesch School-Complex Friedrichshafen
,

Schreienesch School-Complex Friedrichshafen, 2007

The secondary school came in for thoroughgoing renovation because of its considerable contamination with asbestos and PAH compounds. Although public authorities do not regard bad architecture as a building flaw requiring urgent remediation, the unsightliness of the school, constructed with prefabricated slabs of exposed aggregate concrete, was a significant motivation for its transformation. At the same time, a dining area, rooms for the administration and a teachers’ common room were to be added to the building.

As the first step, the entire building had to be stripped back almost totally. As the pollutants had also penetrated the concrete structure, the exposed building supports had to air for a while, before they could be enclosed by the new facing. For this new cladding, we chose wood boarding and painted it a light-coloured turquoise. The roof projects out far over the new façade as protection for the wood and, along with the external supports, forms a spatial filter for the spaces behind. A textile sunscreen is anchored along the thin steel columns.

The strictly gridded layout of the old support structure permitted thorough reconfiguration of the ground plans. The extension made it possible to arrange the rooms around an inner courtyard and to provide light to the hallways in this way.

As the neighbouring primary school is directly adjacent to the secondary one, the new teachers’ common room could be used by both schools. This spans the gap between the two buildings at the upper floor level and covers the schoolyard, which is also shared.

Client:
Stadt Friedrichshafen

Architects:
Lederer Ragnarsdóttir Oei, Stuttgart /
Staub-Architekten, Friedrichshafen

Team:
Henrike Steines, Katja Pütter /
Sybil Jansen, Apollonia Thurner

Structural Engineering:
Breinlinger + Partner VBI Ingenieurgesellschaft mbH, Tuttlingen

Competition:
2005 (with Staub-Architekten, Friedrichshafen)

Construction period:
2006 – 2007

Gross floor area:
4,760 qm (conversion and extension)

Location:
Vogelsangstraße 23, 88046 Friedrichshafen, Germany

Publications
Lederer, Arno / Ragnarsdóttir, Jórunn / Oei, Marc (Hg.):
Lederer Ragnarsdóttir Oei 1.
Jovis Verlag Berlin 2012

Vereinigte Spezialmöbelfabriken (Hg.):
Das Klassenzimmer. Vom Ende des 19. Jahrhunderts bis heute
Tübingen 2010

Falk Jaeger (Hg.): Lederer+Ragnarsdóttir+Oei
Berlin 2008

Bauwelt
47 | 2007

Photos
Roland Halbe, Stuttgart



Back to overview
Next work

Related work

Fellbach Central City
Fellbach Central City, 1987
Primary and secondary school in Ostfildern
Primary and secondary school in Ostfildern, 2002
Real- und Staatliche Fachoberschule in Nuremberg
Real- und Staatliche Fachoberschule in Nuremberg, 2017
Steiner School in Biberach
Steiner School in Biberach, 2012
Steiner Kindergarden in Esslingen
Steiner Kindergarden in Esslingen, 2013
Secondary School in Buchloe
Secondary School in Buchloe, 2013