Musikzentrum Plochingen

Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
Musikzentrum Plochingen
,

Musikzentrum Plochingen, 2021

The Centre for Wind Music is embedded between the industrial area and the railway tracks. In this respect, it engages an exciting dialogue with its environment and radiates a high degree of urban conciseness.
Two taller buildings are connected on the ground floor by a wall that surrounds and unites the entire complex. It features a large arch along the street that opens to an inner courtyard. The left part of the building, the academy building, houses the music rooms and the administrative offices, while the right part of the building accommodates dormitory rooms and a restaurant. Various inner courtyards and a roof terrace create openness.

The two larger-scale spaces, the canteen and the orchestra hall, form the two ends of this linear configuration: the dining area adjoins another courtyard to the north and the large auditorium with its skylight accentuates the southern end of the building ensemble. The dormitory rooms open up to loggias facing north and south. The few rooms situated directly alongside the railway tracks function as offices or practice rooms and are all fitted with soundproof windows.
The entire ensemble is clad with a façade of light-coloured bricks that underscores the monolithic character we wanted for the music centre. Stone flooring and wooden parquet set the tone inside, while the interior walls at the entrance level are made of brick.

Client:
Blasmusikverband Baden-Württemberg e. V.

Architects:
LRO Lederer Ragnarsdóttir Oei, Stuttgart

Team:
Marc Oei, Simone Neuhold, Michael Maier, Peter Leidlmayer

Project Management:
Büro Wehrmann, Stuttgart

Structural Engineering:
Mayer-Vorfelder und Dinkelacker, Stuttgart

Building Engineering:
Schreiber Ingenieure, Ulm

Electrical Engineering:
Neher Butz Ingenieurbüro, Konstanz

Structural Physics:
Bayer Bauphysik, Fellbach

Fire Protection Planning:
umt Umweltingenieure, Ulm

Landscape Architecture:
Helmut Hornstein, Überlingen

Competition:
2016 (1. Prize)

Construction Period:
2017–2021

Gross Floor Area:
6.700 sqm

Gross Volume:
27.400 cbm

Location:
Eisenbahnstraße 59, 73207 Plochingen

Publications
AIT, 01,02 | 2022
02 | 2022

Lederer   Ragnarsdóttir  Oei 2.
Lederer, Arno / Ragnarsdóttir, Jórunn / Oei, Marc (Hg.):
Jovis Verlag Berlin 2021

Kunst in Plochingen – Architektur 2: 20.–21. Jahrhundert
Plochingen am Neckar (Hg.)

Photos
Roland Halbe



Back to overview
Next work

Related work

Catholic Academy in Stuttgart-Hohenheim
Catholic Academy in Stuttgart-Hohenheim, 1999
Hotel in Stuttgart
Hotel in Stuttgart, 2021
Guest House Haupt- und Landgestüt Marbach
Guest House Haupt- und Landgestüt Marbach, 2011
Söllerhütte in Riezlern
Söllerhütte in Riezlern, 1983